next up previous contents index
Next: F. Potentials Up: E. Benchmarks Previous: E.1.2 Nbody0   Contents   Index

E.2 Orbit integration

Benchmark is taking 100,000 leapfrog steps. For 2D optimized potentialsE.3 the timing on a Sparc-1 station is about 12" for log or plummer, and 23" for teusan85 in the core region (orbit remaining within the body of the bar).

more coming



(c) Peter Teuben